BNI Preston CenterDallas, TX Visit a meeting

Sign Company · 7 min read

What signs help visitors find reception from the parking garage?

If visitors call from the garage, walk their route before ordering signs. Put clear directions where they choose a path and confirm the destination when they arrive.

Office hallway intersection with signs pointing visitors toward reception and the elevators

Start with the places where visitors have to choose

I would walk from the parking garage to reception as a first-time visitor and mark every point where the route is unclear. Put a clear direction before a person has to turn, choose an elevator, or enter a hallway. Confirm the destination at the door. Then review the route and the proposed sign types with the property team before you order.

A caller might say they are in the garage without knowing which level or lobby. That usually tells me more than a request for a bigger suite sign. If visitors choose the wrong elevator before they reach your floor, the most visible sign at your door cannot solve the first wrong turn.

Start with the language you use in appointment confirmations. If you call your entrance the main lobby and the building signs call it the north entrance, try to align those words. A sign works with the directions people already have. The first step is to make the two point to the same place.

Walk each route someone can reasonably take

Begin where a new visitor is likely to park. Walk through the doorway, to the elevator or stairs, and on to reception. Do the same from an alternate parking level, the street entrance, and the accessible route as applicable. Note where the route first meets another option that looks plausible.

Take a photo from the visitor's point of view at each decision. A wall that has plenty of room for a sign may not face the people who need it. Check what blocks the view when doors are open, people are waiting, or a cart is in the hallway. Look at how the space is lit when visitors actually arrive.

On the garage levels, check whether the elevator numbering, colors, or names are visible once someone gets out of a vehicle. Write down the words a visitor can see. If you use a color to describe a route, also give it a name or number so the instructions remain useful when the color is hard to distinguish.

If the office is in Dallas and the building has more than one entrance, ask the landlord which entrances are available at different hours. A route that makes sense in the afternoon may lead to a locked door later. Check which direction a sign should give someone who arrives outside your usual hours.

Use fewer words at each decision point

I would give a visitor the instruction they need at that spot. Near a garage door, it may be the lobby or elevator bank to use. At a hallway junction, it may be the suite or reception with an arrow. A directory can carry more detail where people can safely stop and read.

Use the same destination names on each sign. If one says reception and another says check-in, the visitor has to decide whether those are the same. Think about the direction the visitor faces when reading the sign. An arrow that made sense in a plan view can be confusing from the actual approach.

Our guide to sign mistakes that cost businesses customers discusses contrast, too much text, and sign placement. In an office building, I would look at those choices alongside the pace of foot traffic and how much time a reader has to act.

Ask who controls each wall and door

The garage and building lobby may be controlled by the landlord. The tenant may control the signs within its suite. Ask who approves placement, which finishes are allowed, and whether another directory or sign already serves the intended location. Get the building's requirements before paying for fabrication.

Bring the floor plan or a simple route sketch to the sign conversation. I would identify each proposed sign by location, who owns the decision, and whether it points to the next step or identifies the room. That makes it easier to discuss a phased installation if some locations need more approvals than others.

At FASTSIGNS in Dallas, we work with businesses on signage and graphics. If you can share where visitors typically call for help and where the building allows signs, we can discuss which part of the route needs the first change.

Distinguish direction signs from permanent room labels

The U.S. Access Board's guide to signs explains that directional and informational signs for interior spaces generally have visual requirements when provided. Signs identifying permanent rooms and spaces can have both visual and tactile requirements. Ask the property team or project accessibility professional which requirements apply to the signs in your building.

At a single location, there may be a sign telling someone how to get to an elevator and a different sign identifying a permanent room. The signs serve different purposes even when the design looks similar. Include how a person approaches and uses each one when the team reviews the plan.

Check whether existing emergency, exit, and accessibility signs need to remain visible. Coordinate with the building team before changing a required sign or putting new material nearby. I would treat those questions as part of the design review before printing or drilling.

Test the route before final artwork

Ask someone who has never visited the office to follow the directions you currently send. Let them talk through the spots where they pause. Do not tell them the answer as they approach. Note whether they missed a sign, saw the sign but did not understand it, or found that the information was out of date.

You can review proposed sign sizes and placements with a temporary proof where the property allows it. Stand where the visitor would be and see whether the message can be read before the turn. Look at it from different heights and from each direction people approach. A proof taped beside your desk tells you little about the view from the elevator.

If reception serves several offices, test how easily someone can tell where to wait after they reach the floor. A person should be able to find a desk, check-in window, or other point of contact without entering a private area. If the signs are part of a move, also check whether visitors following the former instructions will see a clear update.

Correct the route in the appointment reminder at the same time. Match the entrance, parking instructions, and destination name to the signs. If visitors need to call on arrival, tell them where to wait and what identifying information will help staff find them.

Compare bids using a sign list and a route plan

Give each company the same list of locations, sign functions, and approval requirements. A lower number might include only finished signs, while another scope includes a site walk, artwork revisions, or installation. Our guide to comparing sign company quotes suggests questions about what the estimate includes.

The cost can change with the number of locations, sign material, mounting conditions, and coordination needed with the building. A directory that has to change as tenants move may need a different design from a permanent room label. Ask which pieces can be updated later and how that work would be handled.

If the visitor route also needs an exterior sign, review it as a separate item. Our guide to storefront sign approvals in Dallas covers why exterior work may require its own landlord and city checks. Confirm the current requirements for your address.

Check how the signs work after installation

Walk the routes again after the signs go up. Ask someone to approach from the garage and someone else to start at the street. Compare their experience with the original photos and make a note of any remaining wrong turn. The answer may be a small wording or placement change.

Do a separate check after dark if people visit then. A sign that works with daylight might be difficult to read with reflections or a shadow across the text.

I would also ask reception where people still call for help. Note when those calls happen and how they got their directions. That feedback helps identify whether the issue is a missing sign, an entrance used after hours, or a message that still describes the old route.

Make future updates easy for the property team

Keep a copy of the final locations, wording, artwork, and mounting information. If a suite name changes, check directories and appointment messages as well as the label at the door. Ask who reviews the list when a tenant moves or an entrance changes.

Set aside any item the building expects to update regularly. A tenant listing might need an insert or other changeable format, while a permanent room sign may have different requirements. Discuss the likely changes before choosing a material or attachment method. That makes it easier to update one piece of information without disturbing the rest of the route.

What I would ask before quoting the work

Send a floor plan or a short sequence of photos from the garage to reception. Note where visitors get lost and which areas the landlord controls. Include any building standards or accessibility review requirements you have been given.

I can use that information to discuss where signs could help, which ones may need different materials or approval, and which areas deserve an on-site look. Once the path is clear, we can talk about the wording and placement for each sign. The proposal should show how a visitor gets to the door without having to call.

Questions people ask me

Do I need a sign at every turn?

Focus on the places where a visitor has to make a choice. Confirm the route at points where people may otherwise think they have taken the wrong path.

Should the garage sign show the suite number or reception?

Use the name or number that helps the reader choose the correct route at that location. Repeat the same terms in the directory and the appointment instructions.

Do all directional signs need raised lettering and braille?

The Access Board distinguishes directional signs from signs that identify permanent rooms. Ask the building's accessibility professional to review what applies to each location.

Can I replace the building directory without approval?

Ask the property team who controls the directory and how updates are handled. It may need to approve the wording, materials, or installation before work starts.

Sources

Keep reading