Commercial Banking · 7 min read
Paying for a build-out in leased space: landlord allowance, bank loan or your own cash
A new lease often comes with a build-out bill bigger than the allowance. Here is how to combine the landlord's money, bank financing and cash without starving the business.
How should a business pay for a build-out in leased space?
In my experience, the soundest approach is to layer the money. Use the landlord's tenant improvement allowance first, finance the remaining gap with a term loan that ends no later than the lease does, and keep your own cash for deposits, opening costs and the months while revenue ramps up. A line of credit meant for short-term needs is usually the wrong tool for walls and wiring.
I am a business banker and commercial lender at Frost Bank, and leasehold improvements lending is part of my work with small and mid-size companies around Dallas. Owners usually call me after the lease is signed and the contractor's number arrives higher than the allowance. The best time to call is before the lease is signed, when every piece of the plan can still move.
This guide is general information, not financial, tax or legal advice. Talk to your accountant about how improvements are treated on your books, and to a licensed attorney about the lease itself.
What the build-out actually has to pay for
A build-out, or leasehold improvement, is the work that turns an empty space into your space. It usually includes walls, ceilings, flooring, electrical, plumbing, lighting, restrooms and finishes, plus the design, permits and inspections that come with them.
Some of it stays with the building when you leave, and some of it leaves with you. That distinction drives the financing decision, so sort the budget into three groups before you talk to anyone about money:
Ask the contractor for a bid broken out by these groups rather than a single total. A line-item bid shows which costs the allowance can cover, which belong in an equipment loan and which have to come from cash, and it gives a lender a clear picture of what the money buys.
- Fixed improvements that stay with the building: walls, wiring, plumbing, ceilings and built-in finishes.
- Equipment and furniture that you own and can move: ovens, chairs, computers, shelving and machines.
- Soft costs: design, engineering, permits, deposits and the rent or overlap you pay before opening.
- Opening costs: initial inventory, signage, staff training and marketing for the first months.
How does a tenant improvement allowance work?
A tenant improvement allowance is money the landlord agrees to contribute toward your build-out, written into the lease. It is often paid as reimbursement after work is completed and documented, which means you may need to fund the work first and be repaid later.
The allowance is a negotiating point, not a fixed gift. A larger allowance may come with a longer lease or a higher rent, and the timing and paperwork required to collect it vary from lease to lease. Lonnie Harrison's guide on how a tenant improvement allowance works explains what it typically covers and how the reimbursement process runs.
For a bank, the allowance matters in two ways. It reduces how much you need to borrow, and the timing of the reimbursement affects whether you need short-term bridge funding while the work is underway.
Read the reimbursement conditions closely. Leases often spell out what documentation the landlord needs before paying, such as invoices, proof of payment or a certificate of occupancy, and a missing document can delay the check by weeks. Keep a folder for every invoice and payment from the first day of construction.
When should I negotiate the build-out money?
Before you sign the lease. Once the lease is executed, the allowance, the rent and the term are set, and the build-out budget has to fit around them.
The letter of intent is where these terms first appear. Julie Smith's guide on what a commercial lease letter of intent should say before you build out covers the build-out terms worth settling at that stage, from the allowance to who manages the construction.
I suggest bringing a rough contractor estimate and a draft financing plan to the negotiation. Knowing how much you will need to borrow, and on what terms, tells you how hard to push on the allowance and whether a longer lease in exchange for more money makes sense for your business.
Term loan, SBA loan or line of credit: which fits a build-out?
A term loan is usually the right fit for improvements, because the work is a one-time investment that benefits the business over years. Payments are fixed and the balance goes to zero, ideally before the lease ends.
The U.S. Small Business Administration lists improving real estate and buildings among the eligible uses of 7(a) loan proceeds, along with equipment, furniture, fixtures and working capital, and sets a maximum 7(a) loan of $5 million. SBA describes its 504 loans as financing for major fixed assets, including the purchase, construction or renovation of existing buildings, but not working capital or inventory. Ask your lender how either program would treat improvements in space you lease rather than own. My guide comparing an SBA loan with a conventional bank loan explains the trade-offs.
A line of credit is built for short-term needs such as bridging receivables and payroll. Using it for a build-out ties up the line for years and leaves nothing for the seasonal gaps it was meant to cover. I describe that pattern in my guide to line of credit mistakes.
Why the loan should not outlast the lease
Improvements in leased space usually stay with the building when the lease ends. If the loan runs longer than the lease, you could still be making payments on walls you no longer use, in a space you have moved out of.
Matching the loan term to the remaining lease term keeps the cost tied to the years you benefit. If the lease includes renewal options, talk with your lender about how those options affect the term they are comfortable offering.
Equipment is different, because you own it and can take it with you. Financing equipment separately, over its useful life, often makes more sense than folding it into the build-out loan. My guide on equipment financing versus paying cash walks through that decision.
How much of your own cash should go into the build-out?
Enough to show commitment, but not so much that the business opens with an empty account. Lenders generally expect owners to have money in the project, and they also want to see that the business can survive the opening months.
Before you write the check, plan for these cash needs after construction ends:
Build the cash plan month by month rather than as one total. A simple schedule showing when the contractor is paid, when the allowance arrives, when loan payments start and when the new space begins producing revenue shows exactly where the tight months fall, and that is where a reserve or a short-term bridge earns its keep.
- Security deposits and the first months of rent, including any overlap with your old space.
- Initial inventory, supplies and signage.
- Payroll for staff hired and trained before the doors open.
- Change orders and overruns, which are common on build-outs.
- A cushion for the months while customers find the new location.
What a lender will want to see for a build-out loan
A build-out request is read like any business loan: can the cash flow repay it, what is the credit history, what is the owner's investment and does the purpose make sense. My guide on what a bank looks at when a small business applies for a loan covers those questions in detail.
For leasehold improvements specifically, bring the signed or draft lease, the landlord's allowance terms, the contractor's bid and schedule, your financial statements and tax returns, and a simple projection showing how the new space changes revenue and expenses. The more complete the package, the faster a lender can give you a real answer.
Timing matters to a lender as much as the totals. Construction loans and build-out loans are often funded in stages as work is completed, so share the contractor's schedule early and ask how and when draws would be released. Knowing that in advance keeps the contractor paid on time and keeps the project moving.
Mistakes that squeeze cash during a build-out
Most build-out cash problems come from timing rather than total cost. These are the patterns I see most often with business owners in Carrollton, Dallas and the surrounding area:
Each of these is easier to prevent than to fix. Once the lease is signed and the contractor has started, the options narrow quickly, which is why the financing conversation belongs alongside the lease negotiation rather than after it.
- Signing the lease before knowing what the build-out will cost or how it will be financed.
- Paying the contractor from operating cash while waiting for the allowance reimbursement.
- Using the working capital line for construction and having nothing left for payroll gaps.
- Choosing a loan term longer than the lease.
- Leaving no budget for permits, delays or change orders.
- Opening with a near-empty account because every dollar went into finishes.
Planning the money with your banker before you sign
I work as one main point of contact for my clients' deposits, treasury needs and loans, so the build-out financing can be planned alongside the accounts the business already runs. That makes it easier to see how the loan payment, the allowance timing and your operating cash fit together.
If you are looking at a new space, call me before the lease is final. Bring the space, the draft terms and a contractor estimate if you have one, and we can sketch out how much the allowance covers, what a loan might look like and how much cash the business should keep in reserve.
Questions people ask me
Can the tenant improvement allowance be used for furniture and equipment?
It depends on the lease. Many allowances are limited to permanent improvements that stay with the building, while some leases allow a portion for other costs such as design fees or cabling. Read the allowance language carefully, ask the landlord to clarify before signing and plan separate funding for anything the allowance excludes.
What if the landlord pays the allowance only after the work is finished?
Then you need a way to pay the contractor in the meantime. Some owners use cash and are reimbursed later, while others arrange short-term bridge funding that is repaid when the allowance arrives. Plan this before construction begins, because contractors expect payment on their schedule, not the landlord's.
Does a bank need the landlord's consent for a leasehold improvement loan?
Requirements vary by lender and by loan. Because the improvements become part of a building the business does not own, a lender may ask for documents from the landlord or review specific lease terms. Ask early, since landlord paperwork can take time and can delay closing if it comes up late.
Is it better to pay cash for a build-out if the business can afford it?
Not always. Paying cash avoids interest, but it can leave the business short of working capital right when opening costs and slower early months arrive. Compare the cost of a loan with the risk of running thin, and keep a reserve that covers several months of expenses after the build-out is paid.
How are leasehold improvements handled for taxes?
The tax treatment of improvements to leased space has specific rules on how costs are recovered over time, and those rules change. Ask your CPA how your build-out will be treated before you finalize the budget, because the answer can affect your cash flow in the first years in the new space.
Sources
Keep reading
More from Leslie
- Credit card processing fees: what drives the cost for a small business, and how to lower it
- What a bank looks at when your small business applies for a loan
- Should your business finance equipment or pay for it in cash?
- The line of credit mistakes that surface at renewal time
Money, taxes and insurance
- Certified Public Accountant · Joe
- Bookkeeping · Monis
- Auditor · EJ
- Fractional CFO · Daniel
- Financial Advisor · Joe
- Commercial Financial Broker · Brian