Electrician · 7 min read
Hiring a commercial electrician: what a business owner should settle before work starts
Commercial electrical work affects more than the wiring. It touches your hours, your staff, your lease and your inspections. These are the points to settle before anyone opens a panel.
Settle five things before the first visit
Before hiring a commercial electrician, confirm the company holds a Texas electrical contractor license, define what the work has to support in business terms, agree on how downtime will be handled, know who pulls permits and gets landlord approval, and decide what paperwork you will receive at the end. Settle those five points first and most of the surprises on a commercial job disappear.
We at JET Electrical Contractors are a family-owned electrical contractor in DeSoto that handles commercial work as well as residential, from repairs and new installations to retrofitting outdated systems, with emergency service around the clock. These are the conversations we have with business owners before we start.
Check the license, and the company behind the electrician
In Texas, electrical work is licensed by the Texas Department of Licensing and Regulation. TDLR states that anyone who offers to perform non-exempt electrical work in Texas must be licensed and perform that work through a licensed electrical contractor. That second part matters: the individual electrician's license and the company's electrical contractor license are separate, and a business should check both.
TDLR's website has a license search and a Verify a License link, so this takes a few minutes. Our own electrical contractor license, issued to JET Electrical Contractors LLC, appears in TDLR's public records. For the wider list of questions to ask any electrician, see my guide on hiring a licensed electrician in Texas.
- The company's electrical contractor license, verified on TDLR's site
- The license of the electricians who will do the work
- A current certificate of insurance, if your landlord or lender requires one
- Who supervises the job and who your single point of contact is
Describe the job in terms of what the business needs
Owners often describe electrical work as a list of tasks: three new outlets, brighter lights, a circuit for a new machine. A better starting point is what the space has to do. How many people work there, what equipment runs at the same time, what has to keep running when everything else is off, and what you expect to add in the next few years. Those answers decide circuit sizes, panel capacity and whether the building's service can carry the load.
A short list like the one below lets an electrician give you a scope that fits, rather than a quote that has to be rewritten once the real equipment arrives.
Older commercial buildings deserve an extra question: is the existing system worth keeping? A space that housed an office for years may not have the capacity, the circuits or the protection that a kitchen, a salon or a light manufacturing shop needs. Sometimes the answer is a targeted upgrade to the panel and a few dedicated circuits. Sometimes it is retrofitting the outdated parts of the system so the building can safely carry the new use. Knowing which one you face before you sign a lease or order equipment saves an expensive surprise later.
- Equipment that will run at the same time, with the nameplate details if you have them
- Anything that cannot lose power: refrigeration, servers, point-of-sale, security
- Lighting needs by area, including exterior and parking
- Planned growth: more workstations, new equipment, a second shift
- Hours the space is open, and when work can happen
Downtime is a cost that no quote shows
For a business, the price of the electrical work is only part of the cost. Every hour the lights, registers or equipment are off is lost revenue, idle staff or unhappy customers. Ask how the work will be phased, which circuits will be off and when, and whether parts of the job can be done before opening, after closing or on a weekend.
Plan the shutdowns together and in writing. If refrigeration or servers will lose power, decide in advance how long they can be off and what happens to them during the work. Tell staff, and in a shared building tell the landlord and neighboring tenants, before the power goes off rather than after.
After-hours work can cost more than work during the day, so weigh it honestly. For a retail store or restaurant, an evening shutdown is usually worth it. For an office where a few hours without power in one area is manageable, daytime work in phases may make more sense. The point is to make that choice deliberately, with the electrician, rather than learning on the day which circuits are about to go dark.
Permits, inspections and your landlord
Commercial electrical work commonly needs a city permit and inspection, and the rules vary from city to city across the Dallas area. Ask who will pull the permit, who schedules the inspections, and what happens if an inspector asks for changes. The answer should be written into the scope, not discovered halfway through.
If you lease, read the lease before you call anyone. Many leases require written landlord approval for electrical changes, specify who may work on the building's systems, or set rules for after-hours access. Getting that approval early keeps the work from stopping while the paperwork catches up. Costs depend on all of these details, and my guide on what drives the price of electrical work explains the main factors.
When electrical is one trade in a larger build-out
On a tenant build-out or renovation, the electrician is usually one of several trades working under a general contractor. Coordination matters as much as workmanship: the electrical rough-in has to happen before walls close, and equipment locations have to be final before circuits are run. Changes after that point cost time and money.
If you are hiring the general contractor as well, a commercial builder's guide on the questions to ask a commercial contractor before hiring is worth reading alongside this one. Ask early how the electrical scope fits the overall schedule and who decides when plans change.
Change orders are where commercial budgets drift. Moving a workstation, adding a sign or swapping a piece of equipment can mean a new circuit, a different breaker or a longer run of wire. Agree at the start how changes will be priced and approved, and insist that each one is written down before the work happens.
Safety rules on a working business site
Electrical work in an operating business brings risk to your staff and customers as well as the electricians. OSHA's electrical safety page names the most frequent causes of electrical injuries at work: contact with power lines, lack of ground-fault protection, a missing or discontinuous path to ground, equipment not used in the manner prescribed, and improper use of extension and flexible cords. Several of those are things a business can fix with an electrician's help, such as adding ground-fault protection and replacing extension cords with permanent outlets.
If your own staff service machines or equipment, OSHA's standard for the control of hazardous energy, 29 CFR 1910.147, outlines how equipment must be shut down and locked out so it cannot start or release energy unexpectedly. During our work, the areas and circuits we are on should be off limits, and nobody on your team should reset breakers or open panels to restore power.
Have an emergency plan before the lights go out
The worst time to look for a commercial electrician is during an outage on a busy day. Set up the relationship before you need it. Know where your main disconnect and panels are, keep the path to them clear, and make sure the panel directories are labeled accurately so a manager can tell the electrician which breaker serves which area.
Write down who to call, in what order: the utility for an outage, 911 for fire, smoke or injury, and your electrician for everything on your side of the meter. If you want to understand how a visit runs from the first call onward, my guide to what to expect when an electrician comes out walks through it step by step.
- Where the main disconnect and every panel are, and who has the keys to those rooms
- Which equipment must be shut down safely if power fails, and who does it
- The utility's outage number and your electrician's after-hours number, posted where managers can find them
- What staff should never do: open panels, reset breakers that keep tripping or run cords to restore power
The paperwork to keep when the job is finished
Commercial electrical records outlast the people who were there when the work was done. Managers change, tenants move, and the next electrician will need to know what was installed and where. Ask for these at the end of every job and keep them with your building records.
- An updated, accurate panel directory for every panel touched
- Permit and final inspection records, where the work required them
- A written description of the work, including new circuits and equipment served
- The final invoice matched to the agreed scope and any approved changes
- Any warranty terms in writing, from the contractor and the equipment makers
Starting a commercial project with JET Electrical Contractors
When a business owner contacts us, we start with how the space is used and what the work has to support, then walk the site, look at the panels and service, and talk through scheduling around your hours. We explain the issue or the plan, the options and the costs before any work begins, so you can make the decision with the numbers in hand.
The first consultation is free, by phone or through the request form on our website. We serve businesses across the Dallas area, and because we answer emergency calls around the clock, the same team that installs your system can be the one you call when something fails after hours.
Questions people ask me
Does a commercial electrician need a license in Texas?
Yes. TDLR states that anyone who offers to perform non-exempt electrical work in Texas must be licensed and perform that work through a licensed electrical contractor. You can check both the electrician and the company on TDLR's license search.
Can commercial electrical work be done after hours?
Often, yes. Ask how the work will be phased, which circuits will be off and when, and whether parts of it can be done before opening, after closing or on a weekend, and put the shutdown plan in writing.
Do I need my landlord's permission for electrical work?
Many commercial leases require written landlord approval for electrical changes or set rules for who may work on building systems. Read your lease and get approval before the work is scheduled.
What should I get from the electrician when the job is done?
An updated panel directory, permit and inspection records where required, a written description of the work, a final invoice that matches the agreed scope and any warranty terms in writing.
What causes most electrical injuries at work?
OSHA lists contact with power lines, lack of ground-fault protection, a missing or discontinuous path to ground, equipment not used as prescribed and improper use of extension and flexible cords as the most frequent causes.
Sources
Keep reading
More from Jay
- A bigger breaker, a cheater plug, a warm outlet: electrical myths that put homes at risk
- Does that appliance need its own circuit? Signs a circuit is overloaded and what fixes it
- GFCI or AFCI: what each one does and where your house needs it
- Does your detached garage have enough power for a workshop?
Your home
- Roofing · Chris
- Gutters · Jordan
- Painter · Andrey
- Power Washing · Doug
- Foundation & Concrete · TJ
- Drywall Repair · John