How a commercial construction loan works, from your equity to the final draw and takeout

A construction loan is not a lump sum. Your equity goes in first, the lender releases money in draws as inspected work is finished, and a permanent loan retires it when the building is done.

How does a commercial construction loan work?

A construction loan funds the building in stages, not in one payment. Your equity goes in first, then the lender releases money in draws as an inspector confirms the work is done, and you pay interest only on what has been drawn. When the building is finished and leasing, a permanent or bridge loan pays the construction loan off. At Terrydale Capital, we plan all three pieces together.

We arrange ground-up construction and land financing through construction lenders nationwide from our Dallas headquarters, alongside the bridge, agency and permanent loans that usually follow. The questions below are the ones developers and first-time builders ask us most.

The structure protects both sides. The lender never has more money in the project than the work in place supports, and the borrower pays interest only on money actually used. The cost of that protection is paperwork: budgets, inspections, lien waivers and approvals at every step.

What does a construction lender underwrite?

A construction lender is lending against a building that does not exist yet, so it underwrites the people, the budget and the plan to repay. The Office of the Comptroller of the Currency, which supervises national banks, describes commercial construction loans as financing the construction or renovation of apartments, office buildings, retail centers, hotels, industrial and mixed-use projects, and says prudent underwriting looks at whether the projected net operating income of the finished project supports its expected value.

In practice that means four things. The lender reviews the developer's track record with similar projects. It has the plans and line-item budget reviewed by a qualified person. It studies the market to see whether the rents or sale prices are realistic. And it checks the contractor's experience and financial capacity, because a contractor who fails mid-project is one of the largest risks in the loan.

The package is larger than for a loan on a finished building. Our commercial real estate loan documents checklist covers the core items; construction adds plans, permits, the construction contract, the budget, the schedule and often geotechnical reports.

How much equity do I need, and when does it go in?

Expect to put your equity in before the lender funds the first draw. OCC guidance says a bank's policy should require equity to be contributed before construction loan disbursements begin, because deferring it significantly increases the risk that the project is never finished.

How much depends on the lender, the property type and the market. Lenders size construction loans against both loan to cost, the share of total project cost they will fund, and loan to value, the share of the finished building's appraised value. The lower of the two usually controls the loan amount, and the borrower funds the difference.

Not everything counts as equity. The OCC lists cash, marketable securities, land purchased with cash and costs paid up front, such as architect and engineering fees and permits. It also says deferred developer profit, unearned developer fees and similar items generally do not count. Know which of your contributions a lender will credit before you build the capital stack.

The construction budget: hard costs, soft costs and contingency

The budget is the document the whole loan rests on. Lenders split it into hard costs, which are the physical construction, site work, general conditions and the contractor's fee, and soft costs, which include interest, fees and other development expenses.

Every budget needs a contingency line. The OCC notes that contingency allowances vary with a project's size and complexity but usually range between 5 and 10 percent of the overall budget. A budget without a realistic contingency tells the lender the developer has not priced the risk.

Lenders also look at the construction contract. The OCC notes that a lender can reduce overrun risk by requiring a fixed-price contract, or a cost-plus contract with a guaranteed maximum price when the borrower and the contractor are related. Settle the contract form early, because it affects how the lender views the budget.

Expect the lender to compare your budget with what similar buildings cost. The OCC notes that costs approaching or exceeding the value supported by the project's income are a concern, because a building that costs more to build than it is worth leaves no room for the developer's profit or for overruns.

  • Hard costs: site work, building construction, general conditions, the contractor's fee, bonds and contractor insurance.
  • Soft costs: design, engineering, permits, financing fees, legal, interest during construction and lease-up.
  • Contingency: a separate line for unexpected costs, not a cushion hidden inside other lines.
  • Interest reserve: money set aside in the budget to pay loan interest until the property produces income.

How do construction draws work?

You or the contractor submit a draw request for work completed, the lender has it inspected, the title company confirms no new liens and the lender releases the approved amount, usually less a holdback. That cycle typically repeats monthly until the building is finished.

The OCC describes the controls behind each draw. Draws should be commensurate with the improvements in place as of the inspection. The lender's title policy should be updated with each draw so the title company can confirm there are no outstanding liens, since mechanics liens from unpaid trades are the most common problem. On commercial projects, banks normally use a progress payment plan and retain 10 to 20 percent of each payment to cover overruns or unpaid bills.

The draw process is where most construction loan stress shows up. A missing lien waiver, an inspection that sees less progress than the invoice claims or a change order the lender has not approved can hold up money the contractor is waiting for.

Set up the draw routine before the first shovel goes in. Agree with the lender on the draw schedule, the inspector, the paperwork each request needs and how long approval takes. Then tell the contractor and the subcontractors, so their payment expectations match the lender's timing. A contractor who expects payment in ten days on a draw cycle that takes three weeks will start the project frustrated.

Interest reserves and paying interest during construction

Interest on a construction loan is charged only on the amount drawn, so the monthly interest grows as the building goes up. Many loans fund that interest from an interest reserve built into the budget, so the borrower is not paying it out of pocket while the property earns nothing.

The OCC says an appropriate interest reserve should cover interest through the project's expected completion and lease-up, sale or occupancy, and that once the property's cash flow covers interest, further draws on the reserve should stop. A reserve that runs out early is a warning sign to the lender, so size it with the real schedule, not the hopeful one.

What happens when construction is finished?

The construction loan is repaid by a takeout: a permanent loan, a bridge loan or a sale. The OCC describes permanent loans as term loans that replace construction loans, provided by the construction lender or by others such as life insurance companies, pension funds and CMBS lenders, and notes that bridge loans are usually written for up to three years to carry a property through lease-up.

Some construction lenders want a takeout commitment in hand before they close. The OCC describes standby commitments, which provide back-up financing, and forward commitments, which commit a permanent lender to refinance after completion and usually lease-up. Both come with conditions, so read them closely.

For apartment projects, the permanent loan choice is often between agency, bank and bridge financing. Our guide to agency, bank or bridge loans for a Dallas apartment building explains how that decision is made once the property stabilizes.

Lease-up is the stretch between completion and stabilization, and it is where timelines slip. If the construction loan matures before the property reaches the occupancy a permanent lender needs, a bridge loan or an extension fills the gap. Build that possibility into the plan from the start, including what an extension would cost.

Mistakes that slow or sink a construction loan

Most construction financing problems are visible before closing. These are the ones we work hardest to prevent:

  • A budget with no real contingency, or soft costs left out to make the numbers work.
  • Counting land appreciation or future developer profit as equity the lender will not credit.
  • No plan for the takeout loan until the building is nearly done.
  • An interest reserve sized for the best-case schedule.
  • A general contractor whose experience and finances were never checked against the size of the job.
  • Change orders started in the field before the lender approved them, which stalls the next draw.

How long does it take to close a construction loan?

Longer than a loan on a finished building, because the lender must review plans, budget, contractor and market before it commits. The timing depends on how complete the package is on day one. Our guide on how long a commercial real estate loan takes to close explains what fills the weeks.

Early design work helps the financing as much as the construction. A contractor's conceptual estimate and constructability review give the lender a budget it can trust; Lonnie Harrison describes that stage in what happens in commercial pre-construction.

How we arrange construction financing

We start with the project: land, budget, pro forma and the plan to repay. From there we weigh construction loan options against the alternatives, introduce the key third parties and review packages from multiple lenders so the construction loan and the takeout fit together.

We are an independent commercial financing company, working with banks, debt funds, family offices and other lenders across the country. If you have a project in planning in Dallas–Fort Worth or elsewhere, send us the budget and the schedule and we will tell you how lenders are likely to see it. Lender terms, leverage and rates vary by project and market, and every loan is subject to the lender's own approval.

Questions people ask me

Is a construction loan interest-only?

Most commercial construction loans charge interest only during construction, calculated on the amount drawn so far rather than the full commitment. The interest is often paid from an interest reserve included in the budget. Principal is normally repaid at the end, when a permanent loan, a bridge loan or a sale pays off the construction balance.

What is retainage on a construction loan?

Retainage is the portion of each payment the lender or owner holds back until the work is complete and the trades are paid. OCC guidance says banks on commercial progress payment plans normally retain 10 to 20 percent of each payment to cover overruns or unpaid bills. The retained amount is released at completion once lien and closeout requirements are met.

Can I be my own general contractor on a construction loan?

Some lenders allow it, but they look harder at the arrangement. OCC guidance notes that when the borrower and contractor are the same or related, the contract should be cost plus a fee with a guaranteed maximum price, and that the lender should still confirm the contractor's expertise and financial capacity. Expect more scrutiny, not less.

What happens if the project goes over budget during construction?

The contingency line absorbs normal overruns. If costs exceed the contingency, the lender will usually expect the borrower to put in more equity so the remaining loan balance still covers completion. That is why lenders review the budget closely before closing and why an honest contingency protects the borrower as much as the lender.

Do I need a permanent loan commitment before closing the construction loan?

Not always, but some construction lenders require a takeout commitment, and every lender wants a credible repayment plan. OCC guidance describes standby and forward commitments, both of which come with conditions such as completion and minimum lease-up. Even without a formal commitment, the permanent financing path should be mapped before construction starts.