Building a commercial kitchen: the hood, fire suppression, grease interceptor and everything behind the line

The cooking line is what guests never see and what decides whether a restaurant opens on time. Here is what goes into a commercial kitchen and the order it should be planned in.

What goes into a commercial kitchen build-out?

A commercial kitchen is eight connected systems: hood and exhaust, makeup air, fire suppression, grease interceptor, kitchen plumbing, walk-ins, gas and electrical, and washable finishes. Every one of them is sized from the menu and the equipment schedule. I plan them together, with the equipment supplier, before any rough-in starts.

At Harrison Construction, we build restaurant kitchens inside tenant finish-outs, second-generation restaurant spaces and freestanding buildings, for single operators and franchise brands. The kitchen is where most of a restaurant's construction risk sits, because so much of it is hidden in walls, ceilings, the roof and the ground.

This guide walks through each system, the order that keeps them from colliding and the inspections that stand between a finished kitchen and an open door.

Why the menu comes before the drawings

The kitchen starts from the menu and the equipment schedule, because those two documents decide the hood, the utilities and the layout. A concept built around fryers and a charbroiler needs a different hood, exhaust and suppression system than one built around ovens and cold prep.

An equipment schedule lists every appliance by model, dimensions and utility needs, with the manufacturer's cut sheets attached. Without it, the engineer and contractor are guessing at loads, drain locations and hood coverage, and every guess becomes an assumption in the price.

If the menu is still changing, settle the cooking line first. The prep and storage areas can stay flexible a little longer, but the line drives the most expensive systems in the room.

Franchise operators usually start with an advantage here, because the brand's prototype drawings already include an equipment package. Even then, the prototype has to be fitted to the actual space. Ceiling heights, column locations, roof structure and the location of existing utilities rarely match the prototype exactly, and those differences are where the kitchen design needs the most attention.

Hood, exhaust and makeup air

The hood captures heat, smoke and grease above the cooking line, and the exhaust fan pulls that air through a duct and out of the building. That duct needs a physical route, usually up through the roof, and in leased space every roof penetration needs the landlord's approval.

Air that leaves through the exhaust has to be replaced. Makeup air brings outside air back into the kitchen so the doors do not whistle, the dining room does not turn drafty and the hood can do its job. Makeup air should be planned from the start with the mechanical design, not added after the hood is hung.

Before signing a lease, check whether an exhaust route exists at all. Our guide on whether a space can really become a restaurant covers the questions to ask on the site walk.

In a freestanding building, the route is easier to design because the exhaust can be planned with the roof and structure. In an inline space in a shopping center, the duct may have to cross another tenant's ceiling or reach a roof shared with other businesses, which can add approvals, structural review and time to the schedule.

Fire suppression has to match the cooking line

The fire suppression system above the cooking line is designed around the exact appliances below it. Nozzles are aimed at specific equipment, so the suppression layout has to match the arrangement of the line.

That is why late changes are expensive. Swapping a griddle for a fryer, or moving two pieces of equipment, can mean redesigning the suppression system and adjusting the hood, after both have been reviewed. The fire marshal reviews hood and suppression work on its own, separate from the building inspections.

Lock the cooking line before the hood and suppression submittals go in. If a change is unavoidable, tell your contractor immediately so the effect on the schedule and the price can be checked before equipment is ordered.

Do I need a grease interceptor, and can I reuse the old one?

Almost certainly you need one, and you should not assume the old one works. Dallas Water Utilities states that in Dallas a grease trap is required for any commercial or institutional food service operation, and other cities in the area have their own grease rules.

Sizing follows the plumbing code and the manufacturer's instructions. The City of Dallas Building Inspection guidelines require a grease interceptor submittal for food service locations that need a health permit, filed with the construction documents for plan review, with sizing calculations and the manufacturer's cut sheet for the chosen model.

An interceptor left by a previous restaurant may be the wrong size for a new menu, may sit where it cannot be reached for cleaning, or may be in poor condition. Confirm the size and location with the city or utility before you count on it. A new outdoor interceptor in leased space also needs the landlord's consent, since it means cutting into the site.

Gas, power, water and the walk-in

Gas and electrical loads come from actual equipment data, not from what the space happens to have. An available outlet or gas connection does not prove the building can support the appliance you plan to put there. The engineer adds up the real loads and compares them with the service that exists.

Kitchen plumbing needs floor drains, floor sinks and hand sinks in coordinated locations. A drain shown near an appliance on an old drawing is not proof that it is in the right place for the new equipment.

The walk-in cooler or freezer affects more than storage. Its location decides how deliveries move, whether doors clear, what the floor or pad underneath needs and where the condenser can go.

When the numbers come back short, the fix might be a larger electrical service, a new gas meter or a bigger water heater. Each of those can involve the utility provider and the landlord, and each can take longer than the construction itself, so it pays to find the gap during pre-construction rather than after the walls are closed.

  • Electrical: total connected load, dedicated circuits, panel capacity
  • Gas: appliance demand, meter and line size, shutoffs
  • Water: hot water capacity, backflow protection, hand sink placement
  • Drains: floor drains, floor sinks, indirect waste connections
  • Walk-ins: pad or floor conditions, door clearance, condenser location

Finishes that survive a working kitchen

Kitchen floors and walls are chosen for wet work and daily cleaning, not for looks. The health authority generally expects smooth, durable, easily cleanable surfaces in food preparation areas, and a kitchen that cannot be cleaned well will not stay compliant for long.

Floors need to handle standing water, grease and heavy carts, with transitions that slope toward drains. Walls behind the cooking line and around sinks take steam and spray every day. Choose finishes with the operator's cleaning routine in mind, and confirm them with the health department's plan review before ordering.

Ceilings matter as well. Kitchen ceilings near the cooking line need to resist moisture and grease, and the tiles or panels have to stay in place around the hood. A ceiling that sags or stains within months is a common complaint in kitchens where finishes were chosen to save money at the end of the project.

In what order should a kitchen be built?

Plan first, build second, and inspect each stage before it is covered up. Most kitchen problems come from doing these steps out of order.

Permits come first. In Fort Worth, for example, the building permit must be issued before trade permits are applied for, so the sequence affects the start date. Our guide on the approvals a restaurant build-out needs explains the rest of the permit path.

  • Define the menu and the equipment schedule, with cut sheets
  • Run pre-construction checks on the hood route, interceptor, walk-in and utility capacity
  • Write down scope and responsibilities before purchase orders and subcontracts
  • Rough in plumbing, gas, electrical and ductwork, with inspections before concealment
  • Install the hood, suppression and equipment, then test and start up
  • Pass final building, fire and health inspections before opening

Who should coordinate the kitchen equipment?

The kitchen equipment dealer should be part of the project team from the start, not a delivery at the end. Their drawings and delivery information need to reach the contractor early enough to shape the rough-in.

Any substitution should trigger a coordination check. A replacement fryer with a different footprint or gas input can affect the cabinets, the aisle, hood coverage, plumbing and electrical. Owners should also assign, in writing, who buys, receives, installs and starts up each owner-furnished item, so nothing falls between the dealer and the contractor.

Equipment and the hood are often long-lead items. Our guide on what happens during pre-construction explains how those orders are tracked against the opening date.

On second-generation conversions, the same discipline applies to equipment left behind by the previous restaurant. Used equipment may save money, but each piece should be inspected, matched to the new menu and checked against the hood, gas and electrical design before anyone builds around it.

Mistakes that delay the kitchen, and how we plan around them

The mistakes I see most are assuming an existing hood or interceptor is acceptable, pricing the kitchen with broad allowances, making late changes to the cooking line and relying on a previous restaurant's certificate of occupancy. Every item still open when you ask for a price becomes an assumption in the estimate, and assumptions turn into change orders.

When you contact us, I review what you send and call or email back. Then we visit the site and review the lease, the drawings or the brand's prototype, and you receive a conceptual estimate, value-engineering options and a schedule, with no obligation. Bring your menu, your equipment list and any drawings from the landlord. For the full picture on budget, our guide on what drives the cost of a restaurant build-out covers the factors beyond the kitchen.

Questions people ask me

What is the difference between a grease trap and a grease interceptor?

Dallas Water Utilities describes a grease trap as the smaller indoor device, usually under 100 gallons and often installed below a sink, and a grease interceptor as the large precast concrete tank, typically holding 250 to 5,000 gallons. Both separate fats, oils and grease from wastewater before it reaches the sewer. Which one a kitchen needs depends on the plumbing code and the local utility.

How often does a restaurant grease interceptor have to be cleaned?

Requirements differ by city. In Dallas, Dallas Water Utilities states that interceptors must be cleaned as often as necessary but not less than every 90 days, or whenever 25 percent or more of the interceptor holds floating material, sediment, oils or grease. The waste must be hauled by a liquid waste transporter licensed by the state and the city.

Can a new restaurant reuse the previous tenant's kitchen hood?

Sometimes, but only after it is verified. The existing hood has to fit the new cooking line, have adequate exhaust and makeup air, and work with a fire suppression system designed for the new equipment. A hood that suited the last menu may be too short, in the wrong place or in poor condition. A pre-construction review answers this before the budget assumes it.

Who pays for kitchen systems in a leased space, the landlord or the tenant?

It depends on the lease. Some landlords deliver second-generation space with a hood, interceptor or upgraded utilities, while others deliver a bare shell and leave everything to the tenant. Read the lease exhibits that define landlord and tenant work, and have a contractor review them before signing so the kitchen budget reflects what the landlord actually provides.

What inspections does a commercial kitchen need before opening?

A commercial kitchen usually passes building inspections at rough-in and final, a fire marshal review of the hood and suppression system, and the health authority's pre-opening inspection before the food permit is issued. The certificate of occupancy has to match the new use and scope. A previous restaurant's paperwork does not carry over to a new build-out.